Robert
Phelps
Director, Power and Recovery (retired)
Smurfit Stone Container Corporation
Hopewell, VA |
|
"I
worked in the pulp and paper industry throughout
the South
and Southeast for 48 years. I recently retired as
Director of Power and Recovery from the Hopewell, VA mill.
During
my career, I have worked with numerous power plant
contractors on boiler maintenance and capital projects.
I
consider RMR Mechanical among the best I have worked with.
I
initially used them many years ago as a trial on a small
project. Their performance was excellent and they completed
the project under budget and ahead of schedule. So,
naturally they earned more work. Since that initial trial,
they have been my sole boiler repair contractor, performing
annual outages, major boiler outages, emergency shutdown
services, and even capital projects.
They
know their business and are quite creative in helping
customers get the most out of their repair or project
budgets. For example, they were bidding a big capital
project ($8 million economizer upgrade) along with several
other contractors. The approach selected by the other
contractors was to come in through the roof of the boiler
building. This would have involved removing the
precipitator and quite a bit of other equipment on top of
the building. Removing and reinstalling this equipment would
have been very expensive and time consuming. RMR had the
idea to replace the economizer through the side of the
boiler building by opening a narrow slot in the structure.
They are very competent "riggers" and
boilermakers. These skills, and their capable supervision,
allowed them to complete the project – again – under
budget and ahead of schedule. This saved our facility
significant expense in terms of labor and equipment costs.
RMR
has quality people – probably the best field supervisors in
the business. They have an excellent QA/QC program and a
first-rate Safety program.
Thanks
to RMR's input into scheduling and coordinating, and their
skill at managing manpower on-site, our annual outages have
been reduced from the original 12-14 days down to 8-10 days.
The savings is significant and gets production back online
quicker.
I
would not hesitate to recommend RMR to any company. I've
known these guys for years and trust their knowledge and
judgement."
|